Full-size iron, week-fast builds, and dockwork that's still standing long after the seasonal stuff has washed out. Built for every Finger Lake.
Most builders on the lake run one small barge and a mini excavator, ferrying material back and forth for weeks. We brought the heavy iron — and it shows in the finished work.
We run a 60,000-lb excavator with a C6 hydraulic hammer — while most crews work off a 10,000-lb mini. It drives pilings deeper and sets a dock that holds.
Not seasonal dock that comes out every fall. We build permanent docks and seawalls on driven pilings — built once, built right, made to stay.
Seven barges and four crews mean we carry a full dock of material in one trip. Most docks go up in a week — work that takes other guys months.
No drawn-out back-and-forth. Tell us the lake and the project and we'll get you a free, same-day estimate — straight facts, no pressure.
We build across the whole region — Canandaigua and Keuka are home base, and we're on the move to every lake on the map.
Free estimate, usually same day. Permanent docks, seawalls and lifts across the Finger Lakes.
Get a Free Estimate →